Filter every incoming enquiry against the qualification thresholds, then run qualified clients through the five-stage Glass R Us onboarding journey. The onboarding flow is identical for Retail and Project enquiries.
1
Qualify
2
Enquiry & Briefing
3
Site & Drawings
4
Quotation
5
Fabrication
6
Handover
Step 1 — Log & Qualify Enquiry Filtration Gate
AEnquiry & Client
BScope & Estimated Value
Qualification Logic
Small Job
Under AED 20,000
Disqualify
Retail
AED 20,000 – 149,999
Qualify
Project
AED 150,000 and above
Qualify
Base level (Phase 1). Thresholds are configurable and scale as the business grows — toggle Growth to preview Phase 2 (Retail AED 50k · Project AED 200k). Small jobs are logged but not progressed, keeping sales focused on qualified retail & project work.
Live Classification
Small
< 20k
Disqualify
Retail
20k–150k
Qualify
Project
150k +
Qualify
Project enquiry
AED 850,000 — qualifies as a Project. Ready to onboard.
Stage 01
Enquiry & Briefing
Project
When an enquiry is received it is officially logged and assigned to a dedicated salesperson, who reaches out to the client promptly to establish first contact.
✓
Enquiry logged & reference assigned
Reference ENQ-2025-0148 created and added to the pipeline.
✓
Dedicated salesperson assigned
Single point of contact for the entire journey.
→
Studio Visit or Virtual Briefing Call
The salesperson invites the client to the Glass R Us studio or a structured briefing call to discuss requirements in detail, understand the full scope, and gain clarity on the client's vision and expectations.
Stage 02
Site Measurements & Technical Drawings
Project
At the proposal stage, measurements are typically provided by the client through architectural plans and drawings.
✓
Architectural plans & drawings received
Client-supplied plans used as the basis for measurements and the proposal.
Architectural PlansElevation Drawings
→
Site Visit (if required)
If greater accuracy is needed or drawings are unavailable, a site visit is scheduled and our technicians carry out precise on-site measurements. Arranged once there is sufficient clarity on the client's exact requirements and preferred system.
Stage 03
Quotation, Proposal & Scope Confirmation
Project
Once all details are aligned, a comprehensive brief is communicated to the Estimation Team, who prepare a detailed proposal based on the agreed specifications, system configurations, and sizes.
→
Client Interest & Signed Quotation
Upon the client expressing interest to proceed, a signed quotation is required. For individual / private clients, this serves as formal confirmation of scope.
→
Project Order Agreement (POA)
A POA is prepared and issued, formally locking in the full scope of work, configurations and all project details — countersigned by both parties. KYC documents are collected at this stage.
→
LPO for Corporate / Business Clients
If the client is a company or business entity, they submit a Local Purchase Order (LPO) in lieu of the signed quotation.
Documents required for this client
Stage 04
Technical Sign-Off, Fabrication & Installation
Project
Fabrication and installation proceed only after the client has confirmed all technical details — including sample approvals, system configurations, and technical drawings covering the full project scope.
→
Final On-Site Measurements
The installation team is scheduled on site to take final precise measurements before production commences.
→
Production
Systems are fabricated in our production facility in accordance with the approved technical drawings and confirmed specifications.
→
Installation
Once production is complete, installation is scheduled on site within the agreed project timeline as aligned with the client.
Stage 05
Snag Resolution, Handover & Final Payment
Project
During the final project stage, a comprehensive snag list is prepared, documenting all rectifications to be completed prior to formal handover.
→
Snag Rectification
All items on the snag list are addressed and completed by the project team.
→
Client Sign-Off & Completion Certificate
The snag list is formally signed off by the client. A Completion Certificate is issued confirming the project has been 100% completed by Glass R Us and is being officially handed over.
→
Final Invoice & Payment
With all handover documents in place, the balance invoice is submitted and the project is officially closed. Final payment is followed up per the agreed payment terms.
Completion CertificateFinal Invoice
Project Operations
Al Habtoor VillaAt Risk
AED 8.2M · Rami K.
62% · Due Mar 2025
Four Seasons DIFCOn Track
AED 14.5M · Sara M.
38% · Due Aug 2025
Sobha Hartland IIIn Progress
AED 11.8M · Ahmed T.
15% · Due Dec 2025
One&Only ResidencesPlanning
AED 6.1M · Nour A.
5% · Due Mar 2026
Emaar Beachfront T7New
AED 12.5M · Sara M.
Onboarded · Starts May 2025
Al Habtoor Villa — Facade Project
Al Habtoor Group · AED 8.2M · Lead: Rami Khalil · Est. completion Mar 2025
At Risk
Progress
62%
Phase 3 of 5
Days Remaining
47
Behind by 11 days
Open Milestones
3
1 overdue
Invoiced
AED 5.1M
62% of contract
Operational Timeline Active
Timeline Health
Quick Actions
Project Inventory Our-DB live
Procurement Notes
Project Updates & Notes
Daily Pings
Team Management
Team Overview — Dubai Ops
4 active team members · 8 projects · All pings sent 8:00 AM daily
RK
Rami Khalil
Project Lead
85% load
Al Habtoor VillaDIFC Gate Village
Today: 3 tasks pending · 1 overdue
Near capacity — do not assign new projects
SM
Sara Mansouri
Senior Project Lead
40% load
Four Seasons Tower
Today: 2 tasks pending · 0 overdue
Available — can take a new project
AT
Ahmed Tariq
Site Manager
55% load
Sobha Hartland II
Today: 1 task pending · 0 overdue
Available for support on secondary project
NA
Nour Abdelaziz
Project Coordinator
30% load
One&Only Residences
Today: 2 tasks pending · 0 overdue
Available — ideal for admin-heavy new project
All team task pings for today — Jan 20, 2025
Rami Khalil 1 overdue
!
Chase Low-E panel supplier
Al Habtoor · Overdue · Critical
→
Daily site photo update
Al Habtoor · EOD
↗
Confirm Phase 4 crew
Al Habtoor · Jan 25
Sara Mansouri On track
→
Submit Phase 2 inspection report
Four Seasons · EOD
Review east entrance fin spec
Al Habtoor support · This week
Ahmed Tariq 1 pending
→
Confirm curtain wall spec with client
Sobha Hartland II · Today
Nour Abdelaziz 2 pending
→
Send signed proposal to client
One&Only · Noon
Update project spec sheet with client revisions
One&Only · EOD
Team Capacity — January 2025
Team Member
Active Projects
Load
Capacity Bar
Available for New?
Rami Khalil
Project Lead
2
85%
No
Sara Mansouri
Senior Lead
1
40%
Yes
Ahmed Tariq
Site Manager
1
55%
Support only
Nour Abdelaziz
Coordinator
1
30%
Yes
Recommendation for Emaar Beachfront Tower 7
Assign Sara Mansouri as lead (40% capacity) and Nour Abdelaziz as coordinator (30% capacity). Ahmed Tariq available for site support from Phase 3 onward. Rami Khalil unavailable until Al Habtoor completes in March.
Inventory Management
Stock Overview — Our-DB Live
142 SKUs tracked · 2 critical alerts
Total SKUs
142
Across 6 categories
Critical (Out / Near Zero)
2
Order required now
Low Stock
7
Reorder within 2 wks
Orders In Transit
3
ETA within 6 weeks
Material / SKU
Category
In Stock
Reserved
Available
Status
Action
CRITICAL — Low-E Double Glazed Units 6mm
In stock: 12 pcs · Reserved for Al Habtoor Villa: 840 pcs · Shortfall: 828 pcs Supplier: Gulf Glass Industries · Lead time: 4–6 weeks · Last reorder: 90 days ago
Blocking Phase 4 of Al Habtoor Villa. Order must be placed before Jan 24 to avoid further delay.
CRITICAL — Aluminium Curtain Wall Extrusions
In stock: 420 m · Required for Emaar Beachfront (Phase 3): 2,800 m · Shortfall: 2,380 m Supplier: Al Madina Aluminium · Partial order (390m) in transit
Remaining 1,990m must be ordered to meet May 2025 start. Procurement order pending approval.
LOW — Spider Fitting Assemblies M20 (heavy-duty)
In stock: 42 units · Reorder point: 100 units · Reserved: 0 Supplier: Dorma Gulf · Lead time: 3 weeks
LOW — Frameless Glass Clamp Sets 316SS
In stock: 28 sets · Reorder point: 60 sets · Required for One&Only: 80 sets Supplier: Glasslink International · Lead time: 2–3 weeks
Orders In Transit
Aluminium Extrusion Profiles — 390m
In Transit
Ref: ORD-20250115-AE · Supplier: Al Madina Aluminium Ordered: Jan 15, 2025 · ETA: Feb 5, 2025 Project: Al Habtoor Villa Phase 4
Order placedDispatchedCustomsDelivered
Structural Silicone DC-995 — 200L
Dispatched
Ref: ORD-20250110-SS · Supplier: Dow Chemical ME Ordered: Jan 10, 2025 · ETA: Jan 28, 2025 Project: Four Seasons Tower Phase 2
Polyurethane Backing Rod 20mm — 500m
Arriving Today
Ref: ORD-20250108-PB · Supplier: Tremco ME Ordered: Jan 8, 2025 · Arriving Jan 20 Project: Sobha Hartland II